RATES
CORRESPONDING TO SERVICES FOR TEMPORARY MEMBERS FOR THE YEAR
2006
|
|
TEMP.MEMBER
|
WATER
AND |
REGATTAS |
ELECTRICITY |
15/6 to 15/7 |
(16% VAT) |
Type of mooring |
Rate for 2005 |
Daily rate |
Electricity. Water
|
Breadth |
Length |
m2 |
Euros/m2 |
Euros |
E/m2 |
Euros |
Euros per day |
3,00 |
7,00 |
21,00 |
0,44 |
9,24 €
|
1,26 |
27,72 € |
2,00 |
3,00 |
8,00 |
24,00 |
0,44 |
10,56 €
|
1,26 |
31,68 € |
3,00 |
3,50 |
9,00 |
31,50 |
0,44 |
13,86€ |
1,26 |
41,58 € |
3,00 |
3,50 |
10,00 |
35,00 |
0,44 |
15,40€ |
1,26 |
46,20 € |
3,00 |
4,00 |
11,00 |
44,00 |
0,44 |
19,36€ |
1,26 |
58,08 € |
4,00 |
4,00 |
12,00 |
48,00 |
0,44 |
21,12€ |
1,26 |
63,36 € |
4,00 |
5,00 |
14,00 |
70,00 |
0,44 |
30,80 € |
1,26 |
92,40 € |
4,50 |
5,00 |
15,00 |
75,00 |
0,44 |
33,00€ |
1,26 |
99,00 € |
4,50 |
6,00 |
17,00 |
102,00 |
0,44 |
44,88€ |
1,26 |
134,64€ |
6,00 |
6,00 |
18,00 |
108,00 |
0,44 |
47,52€ |
1,26 |
142,56€ |
6,00 |
7,00 |
20,00 |
140,00 |
0,44 |
61,60 € |
1,26 |
180,80 € |
12,00 |
8,00 |
25,00 |
200,00 |
0,44 |
88,00 € |
1,26 |
264,00 € |
18,00 |
8,00 |
30,00 |
240,00 |
0,44 |
105,60 € |
1,26 |
316,80 € |
100,00 € |
6,00 € |
9,00 |
35,00 |
315,00 |
0,44 |
138,60 € |
1,26 |
315,80€ |
110,00 € |
6,00 € |
10,00 |
40,00 |
400,00 |
0,44 |
176,00 € |
1,26 |
528,00 € |
120,00 € |
6,00 € |
11,00 |
45,00 |
495,00 |
0,44 |
217,80 € |
1,26 |
653,40 € |
125,00 € |
10,00 € |
11,00 |
50,00 |
550,00 |
0,44 |
242,00 € |
1,26 |
726,00 € |
130,00 € |
10,00 € |
12,00 |
55,00 |
660,00 |
0,44 |
290,40 € |
1,26 |
871,20 € |
135,00 € |
10,00 € |
13,00 |
60,00 |
780,00 |
0,44 |
343,20€ |
1,26 |
1.029,60 € |
140,00 € |
16,00 € |
13,00 |
65,00 |
845,00 |
0,44 |
371,80 € |
1,26 |
1.114,40 € |
145,00 € |
16,00 € |
14,00 |
70,00 |
980,00 |
0,44 |
431,20 € |
1,26 |
1.293,60 € |
150,00 € |
16,00 € |
IMPORTANT:
|
| The following discounts will be applied to services rented and accepted by the RCNV:
| ONE MONTH: 25% ONE YEAR: 40%
| A 25% DISCOUNT will be applied to services rented and accepted by the RCNV for the entire regatta period.
|
These rates will increase by 0.06 euros per square metre (breadth x length) and per day for each vessel, according to the ministerial order of 14/02/86 – BOE No.46 of 22/02/86, as the application of Rate T-5 by General and Specific Services, in ports depending on state administration.
| Water and electricity:
| The above rates will be applied when a meter cannot be installed by the RCNV for the water supply, to meet the needs agreed upon with the RCNV at 1.04 Euros/m3.
|
| (**) In the case of an agreement for rates for an entire year, payment for the year must be made in advance.
|
| (***) In the case of not being able to use quay number 25 for over 40 metres in length, the 70-metre rate will be charged (entire quay number 25), as it will be considered impossible to moor another vessel alongside
|
| The rest of the quay may be used for auxiliary vessels.
|
| 1º.- DOCKING AND OCCUPATION OF LAND
| Máximo 5,50 metros de eslora
|
5.70 Euros día |
| 2º.- DRY DOCKING OF LIGHT SAILING VESSELS
| Maximum 5.50 metres in length
|
5.70 euros/day |
| 3º.- DIVERSE SERVICES
| 3.1.- TRAVELIFT (Lifting and launching) 50 tons/200 tons
|
| Season
| period
| 50 tons
| 200 tons
| High
| May / June / July
| 12,25
| 30,00
| Mid
| March / April / August / September
| 10,40
| 25,00
| Low
| January / February / October / November / December
| 8,50
| 20,00
|
|
| 3.2.- TRAVELIFT (Lifting and launching without touching ground) 50 tons
| 8,50 euros/metre length/manoeuvre
|
| 3.3.- TRAVELIFT (Lifting and launching without touching ground) 200 tons
| 20,00 euros/metre length/manoeuvre
|
| 3.4.- 10-TON DERRICK, Positioning masts, engines, etc.
| 44,00 euros per hour or fraction
|
| 3.5.- 3-TON DERRICK, Positioning masts, engines, etc.
| 22,00 euros per hour or fraction
|
| 3.6.- TUG (Services outside dock)
| 100,00 euros per hour or fraction
|
| 3.7.- TUG (Services within dock)
| 40,00 euros per hour or fraction
|
| 3.8.- LABOUR COSTS
| 30,00 euros per hour or fraction
|
| There will be an extra charge of 100% during working hours from Monday to Friday
| Overtime will be charged on Saturdays, Sundays and bank holidays.
|
| 4º.- STAYING IN WORKING AREA OF DRY DOCK
|
| Months
| Day 1 to day 5
| Day 6 to day 15
| Day 16 to day 30
| More than 30 days
| HIGH SEASON
| May/Jun./Jul.
| 1,20
| 1,40
| 2,30
| 3,00
| MID SEASON
| Mar./Apr./Aug./Sept.
| 0,60
| 0,70
| 1,15
| 1,50
| LOW SEASON
| Oct./Nov./Dec./Jan./Feb.
| 0,40
| 0,47
| 0,77
| 1,00
|
|
| 5º PARKING FEES
| 5.1.- CARS
| 1,50 per hour or fraction
|
| 12,00 euros all day maximum charge
|
|
| 5.2.- MOTORCYCLES
| 1,00 per hour or fraction
|
| 8,00 euros all day maximum charge
|
|
| 6º NON-MEMBER OWNERS OF MOORINGS
| TYPE OF MOORING
| MONTHLY RATE
| Breadth
| Length
| m2
| Euros/m2
| Euros
| 3,00
| 7,00
| 21,00
| 3,00
| 66,15
| 3,00
| 8,00
| 24,00
| 3,00
| 75,60
| 3,50
| 9,00
| 31,50
| 3,00
| 99,23
| 4,00
| 11,00
| 44,00
| 3,00
| 138,60
| 4,00
| 12,00
| 48,00
| 3,00
| 151,20
| 5,00
| 14,00
| 70,00
| 3,00
| 220,50
| 5,00
| 15,00
| 75,00
| 3,00
| 236,25
| 6,00
| 17,00
| 102,00
| 3,00
| 321,30
| 6,00
| 18,00
| 108,00
| 3,00
| 340,20
|
|
|